📢 Gate Square #Creator Campaign Phase 2# is officially live!
Join the ZKWASM event series, share your insights, and win a share of 4,000 $ZKWASM!
As a pioneer in zk-based public chains, ZKWASM is now being prominently promoted on the Gate platform!
Three major campaigns are launching simultaneously: Launchpool subscription, CandyDrop airdrop, and Alpha exclusive trading — don’t miss out!
🎨 Campaign 1: Post on Gate Square and win content rewards
📅 Time: July 25, 22:00 – July 29, 22:00 (UTC+8)
📌 How to participate:
Post original content (at least 100 words) on Gate Square related to
The first assembly of the AG600 batch production has been delivered for test flight.
Jin10 data May 12 news, recently, the first aircraft of AG600 batch production (aircraft 1101) has completed total assembly and offline. Currently, the second aircraft of AG600 batch production (aircraft 1102) has completed the installation of major systems such as engine and landing gear, as well as insulation of the entire aircraft wiring harness, and is conducting avionics system testing work. The third aircraft of batch production (aircraft 1103) has also completed the connection of major components such as wings and vertical tail, entering the system installation phase.